Sketch map of Elis

New builds in Pyrgos

63 new-build permits in Pyrgos in the past 12 months, 5 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Pyrgos are down 29% on the same period last year.

34 permits between 13 October 2026 and 11 November 2026, against 48 in the same weeks a year earlier.

Also

  • Pyrgos ranks 1st out of 7 municipalities in Elis for new-build permits over the past 12 months.

    63 permits, 27% of the total in Elis.

  • This month's largest new build in Pyrgos: 3,240 m² of new floor area, 3 floors.

    Permit issued on 27 October 2026, for public assembly.

The numbers in Pyrgos

New-build permits, 30 days
5
New-build permits, 12 months
63
New builds with 3+ floors
5
New permits with a pool
3
New floor area (m²)
11,018
Building permits, 7 days
5
Building permits, 30 days
33
Building permits, 12 months
510

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 7Nov2025Dec 2025: 7DecJan 2026: 5Jan2026Feb 2026: 3FebMar 2026: 4MarApr 2026: 6AprMay 2026: 7MayJun 2026: 99JunJul 2026: 5JulAug 2026: 0AugSep 2026: 7SepOct 2026: 44OctNov 2026: 2 (month to date)2Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds63
  • Small-scale works389
  • Revisions53
  • Pre-approvals5

What is being built in Pyrgos

Over the past 12 months, 63 new-build permits were issued in Pyrgos, out of 510 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (68). Together they add 11,018 m² of new floor area (counting the 42 permits that state it).

Low-rise dominates: only 10% of the new buildings have three or more floors. The average new build has 262 m² of new floor area and 1.6 floors, against 251 m² in Elis.

Pyrgos accounts for 27% of new builds in Elis and ranks 1st of 7 municipalities.

Where Pyrgos stands

#12 months30 days
1Pyrgos635
2Ilida445
3Andravida-Kyllini422

The latest permits in Pyrgos

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
5 November 2026New buildPyrgos2171Residential
4 November 2026New buildPyrgos193Residential
27 October 2026New buildPyrgos33,240Public assembly
20 October 2026New buildPyrgos2284Residential
15 October 2026New buildPyrgos1200Residential
6 October 2026New buildPyrgos1927—
29 September 2026New buildPyrgos2260Residential
29 September 2026New buildPyrgos2119Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

5 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Elis

Windows and doors

63 new builds and 11,018 m² of new floor area. Every one of them will need windows and doors.

All of Elis

Swimming pools

3 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Elis

Building materials

11,018 m² of new floor area in 63 permits: where cement, bricks and steel will be needed.

All of Elis

Electricians and solar

63 new builds and 389 small-scale works, from refurbishments to solar panels.

All of Elis

Frequently asked questions

How many new-build permits were issued in Pyrgos in 2026?

52 from 1 January to 13 November 2026. In the same period of 2025 there were 57, and 68 in the whole of 2025.

How many new apartment buildings are going up in Pyrgos?

In the past 12 months, 5 new-build permits were for buildings with three or more floors, 1 of them with four or more. We count the 52 of 63 permits that state the number of floors.

How does Pyrgos compare with other municipalities in Elis?

It ranks 1st of 7 for new-build permits over the past 12 months, with 27% of the total. The top three are Pyrgos (63), Ilida (44), Andravida-Kyllini (42).

How many new permits with a swimming pool were issued in Pyrgos?

3 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Pyrgos for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Pyrgos was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Pyrgos: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy