Sketch map of Elis

New builds in Elis for window and door makers

Window and door orders are placed months after the permit. Knowing the permit first gives you that head start.

Updated: (latest permit)

Live finding · 13 November 2026

230 new-build permits, past 12 months in Elis.

230 new-build permits were issued in Elis in the past 12 months, with 39,664 m² of new floor area, plus 195 revisions of existing permits. 16 new builds were added in the last 30 days.

Also

  • New-build permits in Elis are down 16% on the same period last year.

    16 permits between 13 October 2026 and 11 November 2026, against 19 in the same weeks a year earlier.

  • This month's largest new build in Elis: 3,240 m² of new floor area, 3 floors in Pyrgos.

    Permit issued on 27 October 2026, for public assembly.

The numbers in Elis

New-build permits, 30 days
16
New-build permits, 12 months
230
New builds with 3+ floors
15
New permits with a pool
20
New floor area (m²)
39,664
Building permits, 7 days
12
Building permits, 30 days
96
Building permits, 12 months
1,476

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 24Nov2025Dec 2025: 14DecJan 2026: 19Jan2026Feb 2026: 9FebMar 2026: 16MarApr 2026: 28AprMay 2026: 30MayJun 2026: 3131JunJul 2026: 20JulAug 2026: 12AugSep 2026: 17SepOct 2026: 1515OctNov 2026: 5 (month to date)5Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds230
  • Small-scale works1,034
  • Revisions195
  • Pre-approvals17

What is being built in Elis

230 new-build permits were issued in Elis in the past 12 months, with 39,664 m² of new floor area, plus 195 revisions of existing permits. 16 new builds were added in the last 30 days.

Over the past 12 months, 230 new-build permits were issued in Elis, out of 1,476 building permits of all types (including small-scale works, revisions and pre-approvals). That is 20% more than in the previous 12 months (191). Together they add 39,664 m² of new floor area (counting the 158 permits that state it).

Low-rise dominates: only 8% of the new buildings have three or more floors. The average new build has 251 m² of new floor area and 1.6 floors, against 322 m² in Greece as a whole. 6 of the new-build permits are for holiday accommodation (hotels, rooms to let). 12 include a swimming pool (5%).

Elis accounts for 1% of all new builds in Greece and ranks 25th of 51 prefectures. The municipalities with the most new builds were Pyrgos (63), Ilida (44) and Andravida-Kyllini (42).

Municipalities with the most new builds

#12 months30 days
1Pyrgos635
2Ilida445
3Andravida-Kyllini422
4Zacharos302
5Andritsaina-Krestenon181
5Pineio180
7Archaia Olybia151

The latest permits in Elis

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
7 November 2026New buildIlida4238Residential, Storage
5 November 2026New buildPyrgos2171Residential
4 November 2026New buildAndravida-Kyllini—414Residential
4 November 2026New buildPyrgos193Residential
3 November 2026New buildIlida256Residential
27 October 2026New buildPyrgos33,240Public assembly
26 October 2026New buildArchaia Olybia2116Residential
26 October 2026New buildIlida2217Retail and commerce
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

15 new buildings with three or more floors in the past year: the likeliest customers for a lift.

See the sector

Swimming pools

20 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Building materials

39,664 m² of new floor area in 230 permits: where cement, bricks and steel will be needed.

See the sector

Electricians and solar

230 new builds and 1,034 small-scale works, from refurbishments to solar panels.

See the sector

Frequently asked questions

How many new-build permits were issued in Elis in 2026?

202 from 1 January to 13 November 2026. In the same period of 2025 there were 168, and 196 in the whole of 2025.

How many new apartment buildings are going up in Elis?

In the past 12 months, 15 new-build permits were for buildings with three or more floors, 7 of them with four or more. We count the 194 of 230 permits that state the number of floors.

Which municipalities in Elis have the most new builds?

Over the past 12 months: 1. Pyrgos (63), 2. Ilida (44), 3. Andravida-Kyllini (42), 4. Zacharos (30), 5. Andritsaina-Krestenon (18).

How many new permits with a swimming pool were issued in Elis?

20 in the past 12 months (new builds and small-scale works), 2 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Elis for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Elis was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Elis: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy