Sketch map of Rhodope

New builds in Rhodope

145 new-build permits in Rhodope in the past 12 months, 12 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

New-build permits in Rhodope are up 18% on the same period last year.

13 permits between 13 October 2026 and 11 November 2026, against 11 in the same weeks a year earlier.

The numbers in Rhodope

New-build permits, 30 days
12
New-build permits, 12 months
145
New builds with 3+ floors
19
New permits with a pool
6
New floor area (m²)
33,001
Building permits, 7 days
10
Building permits, 30 days
87
Building permits, 12 months
1,237

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 9Nov2025Dec 2025: 14DecJan 2026: 9Jan2026Feb 2026: 8FebMar 2026: 2121MarApr 2026: 13AprMay 2026: 9MayJun 2026: 14JunJul 2026: 9JulAug 2026: 11AugSep 2026: 14SepOct 2026: 1414OctNov 2026: 4 (month to date)4Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds145
  • Small-scale works967
  • Revisions117
  • Pre-approvals8

What is being built in Rhodope

Over the past 12 months, 145 new-build permits were issued in Rhodope, out of 1,237 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (143). Together they add 33,001 m² of new floor area (counting the 126 permits that state it).

Low-rise dominates: only 15% of the new buildings have three or more floors. The average new build has 262 m² of new floor area and 1.9 floors, against 322 m² in Greece as a whole. 5 include a swimming pool (3%).

Rhodope accounts for 0.8% of all new builds in Greece and ranks 38th of 51 prefectures. The municipalities with the most new builds were Komotini (89), Maroneia-Sapon (30) and Iasmo (20).

Municipalities with the most new builds

#12 months30 days
1Komotini8910
2Maroneia-Sapon300
3Iasmo202
4Arrianon60

The latest permits in Rhodope

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
3 November 2026New buildKomotini7678Retail and commerce, Residential
3 November 2026New buildKomotini2104Residential
2 November 2026New buildKomotini—600—
29 October 2026New buildKomotini2368Residential, Public assembly
26 October 2026New buildKomotini—167—
23 October 2026New buildIasmo2111Residential
22 October 2026New buildKomotini3271Education, Residential
20 October 2026Pre-approvalMaroneia-Sapon2185—
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

19 new buildings with three or more floors in the past year: the likeliest customers for a lift.

See the sector

Windows and doors

145 new builds and 33,001 m² of new floor area. Every one of them will need windows and doors.

See the sector

Swimming pools

6 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Building materials

33,001 m² of new floor area in 145 permits: where cement, bricks and steel will be needed.

See the sector

Electricians and solar

145 new builds and 967 small-scale works, from refurbishments to solar panels.

See the sector

Frequently asked questions

How many new-build permits were issued in Rhodope in 2026?

126 from 1 January to 13 November 2026. In the same period of 2025 there were 122, and 141 in the whole of 2025.

How many new apartment buildings are going up in Rhodope?

In the past 12 months, 19 new-build permits were for buildings with three or more floors, 15 of them with four or more. We count the 130 of 145 permits that state the number of floors.

Which municipalities in Rhodope have the most new builds?

Over the past 12 months: 1. Komotini (89), 2. Maroneia-Sapon (30), 3. Iasmo (20), 4. Arrianon (6).

How many new permits with a swimming pool were issued in Rhodope?

6 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Rhodope for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Rhodope was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Rhodope: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy