Sketch map of Boeotia

New builds in Levadeon

34 new-build permits in Levadeon in the past 12 months, 2 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Levadeon are down 29% on the same period last year.

17 permits between 13 October 2026 and 11 November 2026, against 24 in the same weeks a year earlier.

Also

  • Levadeon ranks 2nd out of 6 municipalities in Boeotia for new-build permits over the past 12 months.

    34 permits, 21% of the total in Boeotia.

The numbers in Levadeon

New-build permits, 30 days
2
New-build permits, 12 months
34
New builds with 3+ floors
10
New permits with a pool
1
New floor area (m²)
10,980
Building permits, 7 days
1
Building permits, 30 days
16
Building permits, 12 months
281

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 1Nov2025Dec 2025: 2DecJan 2026: 4Jan2026Feb 2026: 3FebMar 2026: 3MarApr 2026: 0AprMay 2026: 2MayJun 2026: 6JunJul 2026: 77JulAug 2026: 1AugSep 2026: 3SepOct 2026: 33OctNov 2026: 0 (month to date)0Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds34
  • Small-scale works213
  • Revisions29
  • Pre-approvals5

What is being built in Levadeon

Over the past 12 months, 34 new-build permits were issued in Levadeon, out of 281 building permits of all types (including small-scale works, revisions and pre-approvals). That is 17% more than in the previous 12 months (29). Together they add 10,980 m² of new floor area (counting the 24 permits that state it).

Mid-rise is the norm here: 43% of the new buildings have three or more floors. The average new build has 458 m² of new floor area and 2.6 floors, against 609 m² in Boeotia.

Levadeon accounts for 21% of new builds in Boeotia and ranks 2nd of 6 municipalities.

Where Levadeon stands

#12 months30 days
1Thivaion486
2Levadeon342
3Distomo-Arachova-Antikyra332

The latest permits in Levadeon

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
5 November 2026Pre-approvalLevadeon189Residential
28 October 2026New buildLevadeon4979—
21 October 2026New buildLevadeon4136—
8 October 2026New buildLevadeon—534Residential
17 September 2026Pre-approvalLevadeon—534Residential
15 September 2026New buildLevadeon12,995Industry and manufacturing, Storage
13 September 2026New buildLevadeon—410—
12 September 2026New buildLevadeon—159—
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

10 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Boeotia

Windows and doors

34 new builds and 10,980 m² of new floor area. Every one of them will need windows and doors.

All of Boeotia

Swimming pools

1 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Boeotia

Building materials

10,980 m² of new floor area in 34 permits: where cement, bricks and steel will be needed.

All of Boeotia

Electricians and solar

34 new builds and 213 small-scale works, from refurbishments to solar panels.

All of Boeotia

Frequently asked questions

How many new-build permits were issued in Levadeon in 2026?

32 from 1 January to 13 November 2026. In the same period of 2025 there were 20, and 22 in the whole of 2025.

How many new apartment buildings are going up in Levadeon?

In the past 12 months, 10 new-build permits were for buildings with three or more floors, 8 of them with four or more. We count the 23 of 34 permits that state the number of floors.

How does Levadeon compare with other municipalities in Boeotia?

It ranks 2nd of 6 for new-build permits over the past 12 months, with 21% of the total. The top three are Thivaion (48), Levadeon (34), Distomo-Arachova-Antikyra (33).

How many new permits with a swimming pool were issued in Levadeon?

1 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Levadeon for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Levadeon was issued on 11 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Levadeon: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy