Sketch map of Pieria

New builds in Dion-Olympos

90 new-build permits in Dion-Olympos in the past 12 months, 3 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Dion-Olympos are down 27% on the same period last year.

35 permits between 13 October 2026 and 11 November 2026, against 48 in the same weeks a year earlier.

The numbers in Dion-Olympos

New-build permits, 30 days
3
New-build permits, 12 months
90
New builds with 3+ floors
20
New permits with a pool
20
New floor area (m²)
20,186
Building permits, 7 days
4
Building permits, 30 days
31
Building permits, 12 months
570

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 5Nov2025Dec 2025: 9DecJan 2026: 7Jan2026Feb 2026: 6FebMar 2026: 9MarApr 2026: 8AprMay 2026: 1111MayJun 2026: 8JunJul 2026: 8JulAug 2026: 8AugSep 2026: 9SepOct 2026: 55OctNov 2026: 0 (month to date)0Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds90
  • Small-scale works346
  • Revisions112
  • Pre-approvals22

What is being built in Dion-Olympos

Over the past 12 months, 90 new-build permits were issued in Dion-Olympos, out of 570 building permits of all types (including small-scale works, revisions and pre-approvals). That is 20% more than in the previous 12 months (75). Together they add 20,186 m² of new floor area (counting the 69 permits that state it).

26% of the new buildings have three or more floors. The average new build has 293 m² of new floor area and 2.0 floors, against 319 m² in Pieria. 13 include a swimming pool (14%).

Dion-Olympos accounts for 28% of new builds in Pieria and ranks 2nd of 3 municipalities.

Where Dion-Olympos stands

#12 months30 days
1Katerini20516
2Dion-Olympos903
3Pydna-Kolindro232

The latest permits in Dion-Olympos

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
26 October 2026New buildDion-Olympos2123—
22 October 2026Pre-approvalDion-Olympos—204Residential, Storage
21 October 2026New buildDion-Olympos1253Residential + pool
16 October 2026New buildDion-Olympos—33—
5 October 2026New buildDion-Olympos———
2 October 2026New buildDion-Olympos3467—
28 September 2026New buildDion-Olympos3324—
26 September 2026New buildDion-Olympos1148—
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

20 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Pieria

Windows and doors

90 new builds and 20,186 m² of new floor area. Every one of them will need windows and doors.

All of Pieria

Swimming pools

20 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Pieria

Building materials

20,186 m² of new floor area in 90 permits: where cement, bricks and steel will be needed.

All of Pieria

Electricians and solar

90 new builds and 346 small-scale works, from refurbishments to solar panels.

All of Pieria

Frequently asked questions

How many new-build permits were issued in Dion-Olympos in 2026?

79 from 1 January to 13 November 2026. In the same period of 2025 there were 64, and 75 in the whole of 2025.

How many new apartment buildings are going up in Dion-Olympos?

In the past 12 months, 20 new-build permits were for buildings with three or more floors, 1 of them with four or more. We count the 77 of 90 permits that state the number of floors.

How does Dion-Olympos compare with other municipalities in Pieria?

It ranks 2nd of 3 for new-build permits over the past 12 months, with 28% of the total. The top three are Katerini (205), Dion-Olympos (90), Pydna-Kolindro (23).

How many new permits with a swimming pool were issued in Dion-Olympos?

20 in the past 12 months (new builds and small-scale works), 2 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Dion-Olympos for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Dion-Olympos was issued on 11 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Dion-Olympos: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy