Sketch map of Messenia

New builds in Messini

41 new-build permits in Messini in the past 12 months, 1 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

1 new-build permits were issued in Messini in the last 30 days.

41 in the past 12 months, 14 building permits of all types in the last 30 days.

The numbers in Messini

New-build permits, 30 days
1
New-build permits, 12 months
41
New builds with 3+ floors
2
New permits with a pool
12
New floor area (m²)
5,073
Building permits, 7 days
1
Building permits, 30 days
14
Building permits, 12 months
309

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 4Nov2025Dec 2025: 1DecJan 2026: 3Jan2026Feb 2026: 1FebMar 2026: 5MarApr 2026: 5AprMay 2026: 3MayJun 2026: 5JunJul 2026: 77JulAug 2026: 1AugSep 2026: 3SepOct 2026: 22OctNov 2026: 1 (month to date)1Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds41
  • Small-scale works209
  • Revisions45
  • Pre-approvals14

What is being built in Messini

Over the past 12 months, 41 new-build permits were issued in Messini, out of 309 building permits of all types (including small-scale works, revisions and pre-approvals). That is 11% more than in the previous 12 months (37). Together they add 5,073 m² of new floor area (counting the 33 permits that state it).

Low-rise dominates: only 6% of the new buildings have three or more floors. The average new build has 154 m² of new floor area and 1.6 floors, against 274 m² in Messenia. 7 include a swimming pool (17%).

Messini accounts for 8% of new builds in Messenia and ranks 5th of 6 municipalities.

Where Messini stands

#12 months30 days
1Kalamata18015
2West Mani13721
3Trifylia904
4Pylos-Nestor633
5Messini411
6Oichalia111

The latest permits in Messini

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
3 November 2026New buildMessini1137—
10 October 2026New buildMessini—96—
1 October 2026New buildMessini1300Health and social care
29 September 2026Pre-approvalMessini274Residential
17 September 2026New buildMessini197—
15 September 2026New buildMessini2124Residential + pool
2 September 2026New buildMessini180—
27 August 2026New buildMessini3135Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

2 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Messenia

Windows and doors

41 new builds and 5,073 m² of new floor area. Every one of them will need windows and doors.

All of Messenia

Swimming pools

12 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Messenia

Building materials

5,073 m² of new floor area in 41 permits: where cement, bricks and steel will be needed.

All of Messenia

Electricians and solar

41 new builds and 209 small-scale works, from refurbishments to solar panels.

All of Messenia

Frequently asked questions

How many new-build permits were issued in Messini in 2026?

36 from 1 January to 13 November 2026. In the same period of 2025 there were 32, and 37 in the whole of 2025.

How many new apartment buildings are going up in Messini?

In the past 12 months, 2 new-build permits were for buildings with three or more floors, 0 of them with four or more. We count the 35 of 41 permits that state the number of floors.

How does Messini compare with other municipalities in Messenia?

It ranks 5th of 6 for new-build permits over the past 12 months, with 8% of the total. The top three are Kalamata (180), West Mani (137), Trifylia (90).

How many new permits with a swimming pool were issued in Messini?

12 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Messini for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Messini was issued on 10 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Messini: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy