Sketch map of Magnesia

New builds and small works in Magnesia for electricians

Every new build needs a full electrical installation, and many small-scale works (refurbishments, solar) need an electrician too.

Updated: (latest permit)

Live finding · 13 November 2026

3,543 new builds and small-scale works, past 12 months in Magnesia.

364 new-build permits and 3,179 small-scale works permits were issued in Magnesia in the past 12 months. The engineer named on each permit is usually the one who recommends trades to the owner.

Also

  • New-build permits in Magnesia are down 40% on the same period last year.

    30 permits between 13 October 2026 and 11 November 2026, against 50 in the same weeks a year earlier.

The numbers in Magnesia

New-build permits, 30 days
26
New-build permits, 12 months
364
New builds with 3+ floors
89
New permits with a pool
72
New floor area (m²)
83,510
Building permits, 7 days
69
Building permits, 30 days
327
Building permits, 12 months
4,241

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 4646Nov2025Dec 2025: 34DecJan 2026: 21Jan2026Feb 2026: 31FebMar 2026: 25MarApr 2026: 25AprMay 2026: 38MayJun 2026: 33JunJul 2026: 34JulAug 2026: 21AugSep 2026: 36SepOct 2026: 2323OctNov 2026: 16 (month to date)16Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds364
  • Small-scale works3,179
  • Revisions581
  • Pre-approvals117

What is being built in Magnesia

364 new-build permits and 3,179 small-scale works permits were issued in Magnesia in the past 12 months. The engineer named on each permit is usually the one who recommends trades to the owner.

Over the past 12 months, 364 new-build permits were issued in Magnesia, out of 4,241 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (386). Together they add 83,510 m² of new floor area (counting the 267 permits that state it).

30% of the new buildings have three or more floors. The average new build has 313 m² of new floor area and 2.5 floors, against 322 m² in Greece as a whole. 17 of the new-build permits are for holiday accommodation (hotels, rooms to let). 39 include a swimming pool (11%).

Magnesia accounts for 2% of all new builds in Greece and ranks 19th of 51 prefectures. The municipalities with the most new builds were Volos (208), Skiatho (45) and Notio Pilio (39).

Municipalities with the most new builds

#12 months30 days
1Volos20813
2Skiatho453
3Notio Pilio391
4Almyro303
5Skopelo224
6Riga Feraio121
7Zagora-Mouresio60
8Alonniso21

The latest permits in Magnesia

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
12 November 2026New buildSkopelo———
11 November 2026New buildVolos5914Residential, Offices
10 November 2026New buildSkopelo174—
10 November 2026New buildVolos2128Residential, Storage
9 November 2026Pre-approvalVolos—482Residential
8 November 2026New buildVolos4639Residential
6 November 2026New buildVolos2388Residential + pool
6 November 2026New buildVolos—195—
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

89 new buildings with three or more floors in the past year: the likeliest customers for a lift.

See the sector

Windows and doors

364 new builds and 83,510 m² of new floor area. Every one of them will need windows and doors.

See the sector

Swimming pools

72 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Building materials

83,510 m² of new floor area in 364 permits: where cement, bricks and steel will be needed.

See the sector

Frequently asked questions

How many new-build permits were issued in Magnesia in 2026?

303 from 1 January to 13 November 2026. In the same period of 2025 there were 332, and 393 in the whole of 2025.

How many new apartment buildings are going up in Magnesia?

In the past 12 months, 89 new-build permits were for buildings with three or more floors, 62 of them with four or more. We count the 300 of 364 permits that state the number of floors.

Which municipalities in Magnesia have the most new builds?

Over the past 12 months: 1. Volos (208), 2. Skiatho (45), 3. Notio Pilio (39), 4. Almyro (30), 5. Skopelo (22).

How many new permits with a swimming pool were issued in Magnesia?

72 in the past 12 months (new builds and small-scale works), 12 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Magnesia for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Magnesia was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Magnesia: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy