Sketch map of Lasithi

New builds in Siteia

27 new-build permits in Siteia in the past 12 months, 3 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

44% of new-build permits in Siteia include a swimming pool.

12 of 27 in the past 12 months.

The numbers in Siteia

New-build permits, 30 days
3
New-build permits, 12 months
27
New builds with 3+ floors
1
New permits with a pool
12
New floor area (m²)
48,754
Building permits, 7 days
4
Building permits, 30 days
15
Building permits, 12 months
180

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 66Nov2025Dec 2025: 3DecJan 2026: 1Jan2026Feb 2026: 3FebMar 2026: 3MarApr 2026: 3AprMay 2026: 1MayJun 2026: 0JunJul 2026: 5JulAug 2026: 0AugSep 2026: 2SepOct 2026: 33OctNov 2026: 1 (month to date)1Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds27
  • Small-scale works104
  • Revisions42
  • Pre-approvals7

What is being built in Siteia

Over the past 12 months, 27 new-build permits were issued in Siteia, out of 180 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (27). Together they add 48,754 m² of new floor area (counting the 24 permits that state it).

Low-rise dominates: only 4% of the new buildings have three or more floors. The average new build has 2,031 m² of new floor area and 1.8 floors, against 486 m² in Lasithi. 12 include a swimming pool (44%).

Siteia accounts for 14% of new builds in Lasithi and ranks 3rd of 4 municipalities.

Where Siteia stands

#12 months30 days
1Agios Nikolaos11412
2Ierapetra516
3Siteia273
4Oropedio30

The latest permits in Siteia

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
3 November 2026New buildSiteia2149Pool
26 October 2026New buildSiteia2113Residential + pool
20 October 2026New buildSiteia2178Residential
14 October 2026Pre-approvalSiteia1113Residential
14 October 2026New buildSiteia173Residential + pool
24 September 2026New buildSiteia1202Pool
22 September 2026New buildSiteia2175Pool
25 August 2026Pre-approvalSiteia11,024Public assembly
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

1 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Lasithi

Windows and doors

27 new builds and 48,754 m² of new floor area. Every one of them will need windows and doors.

All of Lasithi

Swimming pools

12 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Lasithi

Building materials

48,754 m² of new floor area in 27 permits: where cement, bricks and steel will be needed.

All of Lasithi

Electricians and solar

27 new builds and 104 small-scale works, from refurbishments to solar panels.

All of Lasithi

Frequently asked questions

How many new-build permits were issued in Siteia in 2026?

22 from 1 January to 13 November 2026. In the same period of 2025 there were 22, and 27 in the whole of 2025.

How many new apartment buildings are going up in Siteia?

In the past 12 months, 1 new-build permits were for buildings with three or more floors, 1 of them with four or more. We count the 26 of 27 permits that state the number of floors.

How does Siteia compare with other municipalities in Lasithi?

It ranks 3rd of 4 for new-build permits over the past 12 months, with 14% of the total. The top three are Agios Nikolaos (114), Ierapetra (51), Siteia (27).

How many new permits with a swimming pool were issued in Siteia?

12 in the past 12 months (new builds and small-scale works), 2 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Siteia for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Siteia was issued on 11 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Siteia: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy