New buildings with three or more floors in Larissa
For lift companies: every new build with three or more floors, as soon as its permit is issued, long before the shaft is built.
Updated: (latest permit)
Live finding · 13 November 2026
130 new buildings with 3+ floors, past 12 months in Larissa.
In the past 12 months, 130 new-build permits in Larissa were for buildings with three or more floors, 86 of them with four or more; 7 buildings with four or more floors were permitted in the last 30 days. The lift is decided during design, so the engineer on the permit is the person to talk to.
Also
New-build permits in Larissa are down 18% on the same period last year.
36 permits between 13 October 2026 and 11 November 2026, against 44 in the same weeks a year earlier.
The numbers in Larissa
- New-build permits, 30 days
- 35
- New-build permits, 12 months
- 401
- New builds with 3+ floors
- 130
- New permits with a pool
- 10
- New floor area (m²)
- 131,006
- Building permits, 7 days
- 75
- Building permits, 30 days
- 415
- Building permits, 12 months
- 6,228
12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.
By permit type, 12 months
- New builds401
- Small-scale works5,087
- Revisions636
- Pre-approvals104
What is being built in Larissa
In the past 12 months, 130 new-build permits in Larissa were for buildings with three or more floors, 86 of them with four or more; 7 buildings with four or more floors were permitted in the last 30 days. The lift is decided during design, so the engineer on the permit is the person to talk to.
Over the past 12 months, 401 new-build permits were issued in Larissa, out of 6,228 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (424). Together they add 131,006 m² of new floor area (counting the 318 permits that state it).
Mid-rise is the norm here: 41% of the new buildings have three or more floors. The average new build has 412 m² of new floor area and 2.7 floors, against 322 m² in Greece as a whole. 10 of the new-build permits are for holiday accommodation (hotels, rooms to let). 5 include a swimming pool (1%).
Larissa accounts for 2% of all new builds in Greece and ranks 16th of 51 prefectures. The municipalities with the most new builds were Larissa (242), Kileler (41) and Tyrnavo (36).
The latest permits in Larissa
The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.
Who it's for
Windows and doors
401 new builds and 131,006 m² of new floor area. Every one of them will need windows and doors.
See the sectorSwimming pools
10 new permits with a swimming pool in the past year, with the engineer who designed it.
See the sectorBuilding materials
131,006 m² of new floor area in 401 permits: where cement, bricks and steel will be needed.
See the sectorElectricians and solar
401 new builds and 5,087 small-scale works, from refurbishments to solar panels.
See the sectorFrequently asked questions
How many new-build permits were issued in Larissa in 2026?
- 335 from 1 January to 13 November 2026. In the same period of 2025 there were 361, and 427 in the whole of 2025.
How many new apartment buildings are going up in Larissa?
- In the past 12 months, 130 new-build permits were for buildings with three or more floors, 86 of them with four or more. We count the 315 of 401 permits that state the number of floors.
Which municipalities in Larissa have the most new builds?
- Over the past 12 months: 1. Larissa (242), 2. Kileler (41), 3. Tyrnavo (36), 4. Elassona (29), 5. Tebon (24).
How many new permits with a swimming pool were issued in Larissa?
- 10 in the past 12 months (new builds and small-scale works), 1 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.
Where can I see the address and the engineer for each permit?
- In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Larissa for free with the form on this page.
Where does the data come from and how often is it updated?
- From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Larissa was issued on 12 November 2026.
10 free permits for your area
Tell us what you do and we will email you the 10 most recent permits in Larissa: what is being built, how many m², how many floors, exactly where and which engineer designed it.
One time, no subscription, no account needed.
Other municipalities in Larissa
By sector in Larissa
Prefectures with similar activity
- Zakynthos 404
- Aetolia-Acarnania 405
- Corfu 396
- Dodecanese 410
- Lefkada 420
- Rethymno 428
All prefectures
- Aetolia-Acarnania
- Argolis
- Arcadia
- Arta
- Attica
- Achaea
- Boeotia
- Grevena
- Drama
- Dodecanese
- Evros
- Euboea
- Evrytania
- Zakynthos
- Elis
- Imathia
- Heraklion
- Thesprotia
- Thessaloniki
- Ioannina
- Kavala
- Karditsa
- Kastoria
- Corfu
- Kefalonia
- Kilkis
- Kozani
- Corinthia
- Cyclades
- Laconia
- Larissa
- Lasithi
- Lesbos
- Lefkada
- Magnesia
- Messenia
- Xanthi
- Pella
- Pieria
- Preveza
- Rethymno
- Rhodope
- Samos
- Serres
- Trikala
- Phthiotis
- Florina
- Phocis
- Chalkidiki
- Chania
- Chios
Source: e-Adeies permits published on Diavgeia, the Greek government transparency portal. Issue dates, Greek time. Floors and m² where the permit states them; pools only where explicitly mentioned.



