New builds in Sparti

45 new-build permits in Sparti in the past 12 months, 2 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Sparti are down 19% on the same period last year.

30 permits between 13 October 2026 and 11 November 2026, against 37 in the same weeks a year earlier.

Also

  • Sparti ranks 3rd out of 5 municipalities in Laconia for new-build permits over the past 12 months.

    45 permits, 22% of the total in Laconia.

The numbers in Sparti

New-build permits, 30 days
2
New-build permits, 12 months
45
New builds with 3+ floors
4
New permits with a pool
0
New floor area (m²)
8,488
Building permits, 7 days
7
Building permits, 30 days
27
Building permits, 12 months
317

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 3Nov2025Dec 2025: 3DecJan 2026: 3Jan2026Feb 2026: 4FebMar 2026: 7MarApr 2026: 2AprMay 2026: 3MayJun 2026: 99JunJul 2026: 3JulAug 2026: 3AugSep 2026: 4SepOct 2026: 22OctNov 2026: 1 (month to date)1Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds45
  • Small-scale works184
  • Revisions66
  • Pre-approvals22

What is being built in Sparti

Over the past 12 months, 45 new-build permits were issued in Sparti, out of 317 building permits of all types (including small-scale works, revisions and pre-approvals). That is 24% fewer than in the previous 12 months (59). Together they add 8,488 m² of new floor area (counting the 30 permits that state it).

Low-rise dominates: only 11% of the new buildings have three or more floors. The average new build has 283 m² of new floor area and 1.9 floors, against 357 m² in Laconia.

Sparti accounts for 22% of new builds in Laconia and ranks 3rd of 5 municipalities.

Where Sparti stands

#12 months30 days
1Monemvasia759
2Anatoliki Mani544
3Sparti452
4Evrota323

The latest permits in Sparti

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
11 November 2026New buildSparti2108Residential
6 November 2026Pre-approvalSparti2174Residential
3 November 2026Pre-approvalSparti21,000Industry and manufacturing
27 October 2026Pre-approvalSparti1323—
16 October 2026Pre-approvalSparti2186Residential
16 October 2026New buildSparti1140—
12 October 2026New buildSparti1101Residential, Storage
9 October 2026Pre-approvalSparti219Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

4 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Laconia

Windows and doors

45 new builds and 8,488 m² of new floor area. Every one of them will need windows and doors.

All of Laconia

Swimming pools

0 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Laconia

Building materials

8,488 m² of new floor area in 45 permits: where cement, bricks and steel will be needed.

All of Laconia

Electricians and solar

45 new builds and 184 small-scale works, from refurbishments to solar panels.

All of Laconia

Frequently asked questions

How many new-build permits were issued in Sparti in 2026?

41 from 1 January to 13 November 2026. In the same period of 2025 there were 51, and 55 in the whole of 2025.

How many new apartment buildings are going up in Sparti?

In the past 12 months, 4 new-build permits were for buildings with three or more floors, 2 of them with four or more. We count the 38 of 45 permits that state the number of floors.

How does Sparti compare with other municipalities in Laconia?

It ranks 3rd of 5 for new-build permits over the past 12 months, with 22% of the total. The top three are Monemvasia (75), Anatoliki Mani (54), Sparti (45).

How many new permits with a swimming pool were issued in Sparti?

0 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Sparti for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Sparti was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Sparti: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy