Sketch map of Cyclades

New builds in Antiparo

72 new-build permits in Antiparo in the past 12 months, 4 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

75% of new-build permits in Antiparo include a swimming pool.

54 of 72 in the past 12 months.

The numbers in Antiparo

New-build permits, 30 days
4
New-build permits, 12 months
72
New builds with 3+ floors
0
New permits with a pool
61
New floor area (m²)
15,871
Building permits, 7 days
3
Building permits, 30 days
22
Building permits, 12 months
289

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 9Nov2025Dec 2025: 6DecJan 2026: 1111Jan2026Feb 2026: 6FebMar 2026: 5MarApr 2026: 11AprMay 2026: 3MayJun 2026: 6JunJul 2026: 6JulAug 2026: 1AugSep 2026: 3SepOct 2026: 66OctNov 2026: 1 (month to date)1Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds72
  • Small-scale works60
  • Revisions76
  • Pre-approvals81

What is being built in Antiparo

Over the past 12 months, 72 new-build permits were issued in Antiparo, out of 289 building permits of all types (including small-scale works, revisions and pre-approvals). That is 18% more than in the previous 12 months (61). Together they add 15,871 m² of new floor area (counting the 71 permits that state it).

Low-rise dominates: only 0% of the new buildings have three or more floors. The average new build has 224 m² of new floor area and 1.3 floors, against 245 m² in the Cyclades. 54 include a swimming pool (75%).

Antiparo accounts for 5% of new builds in the Cyclades and ranks 7th of 19 municipalities.

Where Antiparo stands

#12 months30 days
1Paros36243
2Naxos & Small Cyclades24216
3Santorini (Thira)15118
6Tino9012
7Antiparo724
8Andro574

The latest permits in Antiparo

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
6 November 2026Pre-approvalAntiparo2224Residential + pool
4 November 2026New buildAntiparo1223Pool
2 November 2026Pre-approvalAntiparo2318Residential + pool
30 October 2026Pre-approvalAntiparo2199Residential + pool
29 October 2026New buildAntiparo1213Residential
23 October 2026Pre-approvalAntiparo1213Residential
23 October 2026Pre-approvalAntiparo2426Temporary accommodation, Public assembly, Storage
22 October 2026New buildAntiparo1263Residential + pool
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

0 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Cyclades

Windows and doors

72 new builds and 15,871 m² of new floor area. Every one of them will need windows and doors.

All of Cyclades

Swimming pools

61 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Cyclades

Building materials

15,871 m² of new floor area in 72 permits: where cement, bricks and steel will be needed.

All of Cyclades

Electricians and solar

72 new builds and 60 small-scale works, from refurbishments to solar panels.

All of Cyclades

Frequently asked questions

How many new-build permits were issued in Antiparo in 2026?

59 from 1 January to 13 November 2026. In the same period of 2025 there were 50, and 63 in the whole of 2025.

How many new apartment buildings are going up in Antiparo?

In the past 12 months, 0 new-build permits were for buildings with three or more floors, 0 of them with four or more. We count the 61 of 72 permits that state the number of floors.

How does Antiparo compare with other municipalities in the Cyclades?

It ranks 7th of 19 for new-build permits over the past 12 months, with 5% of the total. The top three are Paros (362), Naxos & Small Cyclades (242), Santorini (Thira) (151).

How many new permits with a swimming pool were issued in Antiparo?

61 in the past 12 months (new builds and small-scale works), 4 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Antiparo for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Antiparo was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Antiparo: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy