Sketch map of Kastoria

New builds in Argous Orestiko

10 new-build permits in Argous Orestiko in the past 12 months, 1 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

1 new-build permits were issued in Argous Orestiko in the last 30 days.

10 in the past 12 months, 15 building permits of all types in the last 30 days.

The numbers in Argous Orestiko

New-build permits, 30 days
1
New-build permits, 12 months
10
New builds with 3+ floors
0
New permits with a pool
0
New floor area (m²)
3,780
Building permits, 7 days
5
Building permits, 30 days
15
Building permits, 12 months
293

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 22Nov2025Dec 2025: 0DecJan 2026: 1Jan2026Feb 2026: 2FebMar 2026: 0MarApr 2026: 0AprMay 2026: 1MayJun 2026: 1JunJul 2026: 1JulAug 2026: 1AugSep 2026: 0SepOct 2026: 00OctNov 2026: 1 (month to date)1Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds10
  • Small-scale works277
  • Revisions6
  • Pre-approvals0

What is being built in Argous Orestiko

Over the past 12 months, 10 new-build permits were issued in Argous Orestiko, out of 293 building permits of all types (including small-scale works, revisions and pre-approvals). Together they add 3,780 m² of new floor area (counting the 8 permits that state it).

Argous Orestiko accounts for 29% of new builds in Kastoria and ranks 2nd of 4 municipalities.

Where Argous Orestiko stands

#12 months30 days
1Kastoria252
2Argous Orestiko101
3Nestorio00

The latest permits in Argous Orestiko

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
11 November 2026Small worksArgous Orestiko———
9 November 2026Small worksArgous Orestiko———
6 November 2026New buildArgous Orestiko134Residential
4 November 2026Small worksArgous Orestiko———
2 November 2026Small worksArgous Orestiko———
29 October 2026Small worksArgous Orestiko———
26 October 2026Small worksArgous Orestiko———
25 October 2026Small worksArgous Orestiko———
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

0 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Kastoria

Windows and doors

10 new builds and 3,780 m² of new floor area. Every one of them will need windows and doors.

All of Kastoria

Swimming pools

0 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Kastoria

Building materials

3,780 m² of new floor area in 10 permits: where cement, bricks and steel will be needed.

All of Kastoria

Electricians and solar

10 new builds and 277 small-scale works, from refurbishments to solar panels.

All of Kastoria

Frequently asked questions

How many new-build permits were issued in Argous Orestiko in 2026?

8 from 1 January to 13 November 2026. In the same period of 2025 there were 6, and 8 in the whole of 2025.

How many new apartment buildings are going up in Argous Orestiko?

In the past 12 months, 0 new-build permits were for buildings with three or more floors, 0 of them with four or more. We count the 9 of 10 permits that state the number of floors.

How does Argous Orestiko compare with other municipalities in Kastoria?

It ranks 2nd of 4 for new-build permits over the past 12 months, with 29% of the total. The top three are Kastoria (25), Argous Orestiko (10).

How many new permits with a swimming pool were issued in Argous Orestiko?

0 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Argous Orestiko for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Argous Orestiko was issued on 11 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Argous Orestiko: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy