Sketch map of Chios

New builds and small works in Chios for electricians

Every new build needs a full electrical installation, and many small-scale works (refurbishments, solar) need an electrician too.

Updated: (latest permit)

Live finding · 13 November 2026

1,056 new builds and small-scale works, past 12 months in Chios.

169 new-build permits and 887 small-scale works permits were issued in Chios in the past 12 months. The engineer named on each permit is usually the one who recommends trades to the owner.

Also

  • New-build permits in Chios are down 41% on the same period last year.

    10 permits between 13 October 2026 and 11 November 2026, against 17 in the same weeks a year earlier.

The numbers in Chios

New-build permits, 30 days
10
New-build permits, 12 months
169
New builds with 3+ floors
12
New permits with a pool
23
New floor area (m²)
18,142
Building permits, 7 days
19
Building permits, 30 days
101
Building permits, 12 months
1,485

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 12Nov2025Dec 2025: 12DecJan 2026: 7Jan2026Feb 2026: 11FebMar 2026: 17MarApr 2026: 2525AprMay 2026: 16MayJun 2026: 14JunJul 2026: 15JulAug 2026: 14AugSep 2026: 12SepOct 2026: 1212OctNov 2026: 7 (month to date)7Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds169
  • Small-scale works887
  • Revisions234
  • Pre-approvals195

What is being built in Chios

169 new-build permits and 887 small-scale works permits were issued in Chios in the past 12 months. The engineer named on each permit is usually the one who recommends trades to the owner.

Over the past 12 months, 169 new-build permits were issued in Chios, out of 1,485 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (174). Together they add 18,142 m² of new floor area (counting the 109 permits that state it).

Low-rise dominates: only 8% of the new buildings have three or more floors. The average new build has 166 m² of new floor area and 1.9 floors, against 322 m² in Greece as a whole. 8 of the new-build permits are for holiday accommodation (hotels, rooms to let).

Chios accounts for 0.9% of all new builds in Greece and ranks 31st of 51 prefectures. The municipalities with the most new builds were Chios (160), Iroiki Niso Psaron (5) and Oinousson (4).

Municipalities with the most new builds

#12 months30 days
1Chios16010
2Iroiki Niso Psaron50
3Oinousson40

The latest permits in Chios

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
12 November 2026New buildChios2122Residential, Temporary accommodation, Storage
12 November 2026New buildChios1125Residential, Storage
9 November 2026Pre-approvalChios228Residential
9 November 2026New buildChios2184Residential
9 November 2026New buildChios26Residential
9 November 2026New buildChios194Residential
4 November 2026Pre-approvalChios3181Residential
4 November 2026New buildChios2157Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

12 new buildings with three or more floors in the past year: the likeliest customers for a lift.

See the sector

Windows and doors

169 new builds and 18,142 m² of new floor area. Every one of them will need windows and doors.

See the sector

Swimming pools

23 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Building materials

18,142 m² of new floor area in 169 permits: where cement, bricks and steel will be needed.

See the sector

Frequently asked questions

How many new-build permits were issued in Chios in 2026?

150 from 1 January to 13 November 2026. In the same period of 2025 there were 149, and 168 in the whole of 2025.

How many new apartment buildings are going up in Chios?

In the past 12 months, 12 new-build permits were for buildings with three or more floors, 4 of them with four or more. We count the 155 of 169 permits that state the number of floors.

Which municipalities in Chios have the most new builds?

Over the past 12 months: 1. Chios (160), 2. Iroiki Niso Psaron (5), 3. Oinousson (4).

How many new permits with a swimming pool were issued in Chios?

23 in the past 12 months (new builds and small-scale works), 3 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Chios for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Chios was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Chios: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy